$46.84
▲ +5.47% today
Close 26 Nov 2026
Chart
Price
Close
200-day average
Company profile
About DPM Metals Inc
DPM Metals is a Canada-based precious metals mining company with operations and projects in Bulgaria, Bosnia and Herzegovina, Serbia and Ecuador. Its producing assets include the Chelopech and Ada Tepe mines in Bulgaria and the Vareš operation in Bosnia and Herzegovina. Development projects include Čoka Rakita in Serbia and Loma Larga in Ecuador, and it also holds exploration interests. It lists on the TSX and ASX.
Annual report highlights
Annual Report 2025
DPM Metals · FY2025 reported results · Reported in USD
2-year reported financial history
| Metric | FY2024 | FY2025 | YoY |
|---|---|---|---|
| Revenue | US$607m | US$950m | +56.6% |
| Net profit (NPAT) | US$243m | US$369m | +51.9% |
FY2025 cash flow, debt & franking
- Operating cash flow
- US$492m
- Free cash flow
- US$505m
- Cash & equivalents
- US$498m
- Net cash
- US$498m
What went well in FY2025
- Record adjusted earnings Adjusted net earnings from continuing operations were $443.2 million (2024 – $232.2 million), up 91%. Adjusted basic earnings per share were $2.39 (2024 – $1.29). Net earnings from continuing operations were $369 million.
- Record cash flow and revenue Revenue rose 57% to $950.5 million. Adjusted EBITDA rose 79% to $585.6 million. Cash provided from operating activities from continuing operations was $492 million and free cash flow from continuing operations was $505 million.
- Eleventh year of meeting guidance Chelopech and Ada Tepe achieved gold production guidance for the eleventh consecutive year, producing 244,979 ounces of gold and 30 million pounds of copper in 2025.
- Vareš acquisition and growth pipeline Completed the acquisition of Adriatic and the Vareš mine on September 3, 2025. Advanced the Čoka Rakita feasibility study and permitting. Announced initial Inferred Rakita Camp resources. And added 10 years of mine life at Chelopech following a new discovery of high-grade mineralization.
- Strong balance sheet and shareholder returns Ended the year with $497.8 million in cash, an undrawn $400.0 million New RCF and no debt. Returned $145.5 million through dividends and share repurchases, representing 29% of free cash flow from continuing operations. Share price increased 225%.
Key risks for FY2026
- Gold and copper price volatility
Metal prices can fluctuate widely.
Read more (4)
- If gold and/or copper prices were to decline significantly there can be no assurance cash flow, cash on hand and the RCF will be sufficient for operating and capital requirements.
- A significant price decline could reduce Mineral Reserve and Resource estimates and cause impairments.
- 2026 guidance assumes gold of $4,200/oz, copper of $5.00/lb and silver of $50/oz.
- A 10% fall in gold reduces GEO sold by 10 Koz and raises all-in sustaining cost by $50 per GEO.
- Vareš ramp-up and operating performance
Vareš was acquired on September 3, 2025 and is on track to ramp up to full production by end of 2026.
Read more (2)
- 2026 guidance of 105-130 Koz GEO produced depends on mines performing at planned levels.
- Failure of plant, equipment or processes, lower ore grades, recoveries or ore mined/milled, or undiscovered acquisition risks could affect results.
- Euro strength and cost inflation
Revenue is in U.S. dollars while most operating and capital expenditure is in Bulgarian lev and BAM (pegged to the Euro) and Canadian dollars.
Read more (1)
- 2026 guidance assumes a Euro/US$ rate of 1.20 and a 10% move in the Euro changes all-in sustaining cost by $93 per GEO. All-in sustaining cost is guided at $1,300 - $1,450 per GEO sold for 2026 versus $1,477 in 2025, with energy and labour inflation a risk.
- Tax, royalty and tariff changes
The Company is exposed to changes in tax, tariff and royalty regimes.
Read more (3)
- On January 30, 2026, Bulgaria adopted new royalty rates of 2% - 6% for gold and silver and 2% - 5% for copper, which will apply to Chelopech upon renewal of its concession in 2029.
- A 2025 Bulgarian levy of $24.4 million reduced 2025 net earnings.
- Changes to China VAT and duty on concentrate imports could also have an impact.
- Lower production from mine life and project delays
Ada Tepe reaches the end of its mine life by mid-2026 and 2028 gold production outlook falls to 155 - 175 Koz.
Read more (1)
- Čoka Rakita is expected to start construction in early 2027 with first concentrate in the first half of 2029, and Loma Larga spending is being minimized pending resolution of the revocation of its environmental licence.
Summarised from the company’s Annual Report 2025. Figures, results and risks are drawn from the company’s own statements. General information only, not financial advice.
At the close
Key numbers
- Market cap
- $10.6b
- P/E (trailing)
- 9.1×
- Dividend yield
- 0.4%
- Franking
- 0%
- Grossed-up yield
- 0.4%
- 52-week range
- $41.62 – $71.31
- Avg daily volume (20d)
- 49k
- Short interest
- 1.6%
- Beta (vs ASX 200)
- 2.20
- 1-year return
- +16.0%
- RSI (14)
- 41
- vs 200-day average
- −12.1%
Income
Dividend history
| Ex-date | Paid | Type | Amount | Franked | Grossed-up |
|---|---|---|---|---|---|
| 29 Sep 2026 | 15 Oct 2026 | Interim | $0.042 | 0% | $0.042 |