$5.55
▲ +6.32% today
Close 26 Nov 2026
Chart
Price
Close
200-day average
Company profile
About Iluka Resources
Iluka Resources is a critical minerals company headquartered in Perth with more than 70 years of experience in exploration, mining, processing, marketing and rehabilitation. It produces zircon and titanium dioxide feedstocks (rutile and synthetic rutile), including from Jacinth-Ambrosia in South Australia, the largest zircon mine globally. It is building Australia's first integrated rare earths refinery at Eneabba, Western Australia, and holds 20% of Deterra Royalties.
Annual report highlights
Annual Report 2025
Iluka Resources Limited · FY2025 reported results
2-year reported financial history
| Metric | FY2024 | FY2025 | YoY |
|---|---|---|---|
| Revenue | A$1.17b | A$1.02b | −13.2% |
| EBITDA | - | A$329m | - |
| EBIT | - | −A$386m | - |
| Net profit (NPAT) | A$231m | −A$288m | - |
| Earnings per share | 54.1c | −67.3c | - |
| Ordinary dividend | 8.00c | 5.00c | −37.5% |
FY2025 cash flow, debt & franking
- Operating cash flow
- −A$57.5m
- Capital expenditure
- A$862m
- Free cash flow
- −A$920m
- Cash & equivalents
- A$45.7m
- Net debt
- A$1.06b
- Income tax paid
- A$93.8m
- Franking credit balance
- A$906m
What went well in FY2025
- Balranald commissioning milestone Mining has commenced at Balranald and heavy mineral concentrate has been produced. Construction work progressed safely through 2025, with the focus during the final months of the year on commissioning the mining equipment and the processing plant. Iluka expects to progressively ramp up mining and production of heavy mineral concentrate to steady-state by mid-2026. Construction of the solar farm began in mid-October 2025.
- Eneabba rare earths refinery progress Engineering at Eneabba is now more than 95% complete and civil construction is well advanced. All major equipment has been ordered, with much of it arriving on site for early placement ahead of installation. With more than $1 billion already spent or committed, the capital estimate to deliver the project remains $1.7–$1.8 billion. The refinery is scheduled to be commissioned in 2027.
- Improved safety and environmental performance Total Recordable Injury Frequency Rate decreased from 3.8 to 3.4. Serious potential incidents fell from 14 to 3. Iluka rehabilitated 272 hectares of land across the portfolio and successfully closed the former Gingin mine in Western Australia. Rehabilitation of the former Old Hickory/Concord mine in Virginia was recognised with a Mineral Mine Reclamation Award.
- Cost discipline and operational settings Cash costs of production decreased by 9% from the prior year with unit cash cost per tonne of Z/R/SR produced decreasing by 19% to $1,054 per tonne. Production activities at the Cataby mine and Synthetic Rutile Kiln 2 in Western Australia were suspended effective 1 December 2025 to save costs, liberate inventory and cash, and preserve balance sheet strength. A complete cost reset was undertaken in November 2025, reducing costs by ~$36 million per annum.
- Zircon sales resilience Total zircon sales of 268 thousand tonnes for the year were up 16% from 2024. Sales included 111 thousand tonnes of zircon-in-concentrate, a 70% increase on the prior year. Zircon revenue for the year was US$381 million, representing a marginal decline of approximately 3.7% compared to 2024. The company achieved a weighted average zircon sand price of US$1,643 per tonne and materially stronger pricing outcomes than competitors.
Key risks for FY2026
- Growth (Resource, Reserve and Pipeline)
Iluka aims to generate and deliver on growth options through exploration, innovation, project development and appropriate external growth opportunities.
Read more (3)
- Resource and Reserve assessments involve significant judgement and no guarantee of assurance of estimated mineral recovery levels or commercial viability can be provided.
- Actual quality and characteristics of mineral deposits cannot be known until mining takes place and may differ from assumptions.
- Iluka regularly assesses its ability to enhance production profile or extend economic life through new projects and provides standing updates to the Audit and Risk Committee.
- Market and Geopolitical Conditions
Trade policy uncertainty continues to impact global economic activity, including Iluka's end markets.
Read more (3)
- Tariffs and geopolitical conflicts continue to influence forecast reliability, affecting mineral sands customers' purchasing behaviour.
- Uncertainty remains as to a sustainable pricing mechanism for Western rare earths producers that is independent of the Asian Metals Index.
- Iluka is closely reviewing industry supply/demand dynamics, monitoring customer credit health and negotiating long-term offtake contracts.
- Project Execution and Commissioning
Large capital projects are, by their nature, complex and subject to factors often outside Iluka's control, including inflationary environment, regulatory, market competition for talent, and supply chains.
Read more (3)
- Project execution risks include the ability to obtain appropriate access to property, cost escalation, construction and commissioning risks.
- Execution of the Eneabba refinery and Balranald project is closely monitored, with a number of independent reviews undertaken.
- Iluka has employed an experienced Project Director for Eneabba and a Chief Metallurgist for rare earths.
- Cybersecurity
An increasingly technology-dependent landscape and integration of cloud-based applications and services means Iluka is exposed to operational disruption and/or reputational damage from cyber incidents, which are evolving in sophistication.
Read more (2)
- Iluka's increasing public profile in critical minerals means it becomes more visible to, and a target of, cyber criminals.
- Iluka conducts continuous cyber penetration testing including security simulations, focuses on multi-factor authentication and patch management, and reports cyber risk management governance to the Audit and Risk Committee.
- People and Health and Safety of Workforce
Ensuring a productive and engaged workforce, maintaining trust and social license to operate.
Read more (3)
- Execution of strategic imperatives and growth plans requires attraction, development and retention of critical roles while navigating a changing skills landscape.
- Increasing complexity and regulatory requirements in managing the employee psychosocial safety environment.
- Iluka focuses on health and safety including physical, mental and social wellbeing and strengthening leadership development toolsets.
Summarised from the company’s Annual Report 2025. Figures, results and risks are drawn from the company’s own statements. General information only, not financial advice.
At the close
Key numbers
- Market cap
- $2.4b
- P/E (trailing)
- -
- Dividend yield
- 1.1%
- Franking
- 100%
- Grossed-up yield
- 1.6%
- 52-week range
- $4.94 – $8.55
- Avg daily volume (20d)
- 2.2m
- Short interest
- 7.4%
- Beta (vs ASX 200)
- 2.12
- 1-year return
- −14.0%
- RSI (14)
- 48
- vs 200-day average
- −16.8%
Income
Dividend history
Franking credit balance: A$906m (FY2025) · DRP: Active
| Ex-date | Paid | Type | Amount | Franked | Grossed-up |
|---|---|---|---|---|---|
| 31 Aug 2026 | 24 Sep 2026 | Interim | $0.030 | 100% | $0.043 |
ASX Listing Rule 4.10 · FY2025 annual report · as at 31 Jan 2026
Ownership & shareholders
- Total shareholders
- 31,688
- Top 20 ownership
- 80.5%
- Unmarketable parcels
- 3,453
- Dividend reinvestment (DRP)
- Active