About Iperionx
IperionX is a titanium company listed on the ASX since December 2020 and the Nasdaq Capital Market since June 2022. It uses patented HAMR and HSPT metal technologies to produce titanium powders, mill products such as plate and bar, and finished titanium components from titanium minerals or scrap. It operates a Titanium Manufacturing Campus in Virginia, a pilot facility in Utah, and the Atlas-Titan titanium, rare earth and zircon mineral sands project in Tennessee.
Annual report highlights
Annual Report 2026
IperionX · FY2026 reported results · Reported in USD
FY2026 reported actuals
| Item | FY2026 actual |
|---|---|
| Revenue | 0m (nil) |
| Underlying EBITDA | n/a |
| Underlying attributable profit | −66.8m |
| Underlying EPS | −19.9c |
| DPS | 0.0c |
FY2026 cash flow, debt & franking
- Operating cash flow
- −US$45.0m
- Capital expenditure
- US$19.1m
- Free cash flow
- −US$64.1m
- Cash & equivalents
- US$35.2m
- Net cash
- US$31.1m
- Income tax paid
- US$10k
What went well in FY2026
- Titan DFS completed The U.S. Government-supported Titan Definitive Feasibility Study was completed in June 2026, delivering an after-tax NPV8 of US$813 million, after-tax IRR of 39.4%, after-tax payback of 3.6 years and forecast after-tax free cash flow of US$1.9 billion over an initial 14-year mine plan.
- Powder capacity scaled and 24/7 production Virginia operations transitioned to a 24/7 production schedule. Completed commissioning and increased nameplate powder capacity 60% to 200 metric tons per annum, supporting a scale-up of powder production capacity of approximately 1,400 tpa.
- U.S. Government funding and contracts DPA Title III award (US$12.7 million) and IBAS award (US$47.1 million) are fully obligated, with US$22.7 million reimbursed at June 30, 2026. Holds a U.S. Army SBIR Phase III contract with a ceiling of US$99.0 million and two task orders totaling approximately US$19.8 million awarded.
- Product validation IperionX Ti-6Al-4V fasteners exceeded SAE Grade 8 steel torque-to-yield performance and achieved tensile properties above standard aerospace grade titanium fastener benchmarks in independent testing. Received a U.S. Army GVSC purchase order for prototype titanium fasteners.
- Funding and strategic expansion Raised US$46 million in equity from existing shareholders and completed a US$50.0 million placement on July 7, 2026. Acquired the strategic Atlas critical mineral property, adding approximately 70 acres of at-surface critical-mineral stockpiles and approximately 180 acres of pre-stripped Lower McNairy mineralization.
Key risks for FY2027
- Capital and funding risk
Future expansion of the Company’s titanium facilities and any future development of the Company’s mineral properties will require substantial additional financing.
Read more (2)
- Failure to obtain it may delay or postpone development.
- Cash and cash equivalents fell to US$35.2 million from US$54.8 million, net outflows from operating and investing activities were US$63.5 million, and a US$50.0 million placement was completed on July 7, 2026.
- Mineral development risk
The exploration for, and development of, mineral deposits involves a high degree of risk.
Read more (2)
- There can be no guarantee that studies will confirm technical and economic viability or that properties will be brought into production.
- Titan development requires financing, procurement, construction and commissioning following the DFS (Phase 1 development capital of US$228.1 million).
- Commodity price risk
The price of titanium metal and other critical minerals, including titanium feedstocks, rare earth elements, silica sand and zircon fluctuate widely and are beyond the Group’s control.
Read more (1)
- The Group currently does not engage in any hedging or derivative transactions to manage commodity price risk.
- Competition risk
The Group competes with other domestic and international companies in the titanium technology and critical minerals industries, some of whom have larger financial and operating resources.
Read more (2)
- Increased competition could lead to higher supply or lower overall pricing.
- There can be no guarantee the Group will secure additional surface and mineral rights.
- Continued losses and pre-revenue scale-up
The Group did not recognize revenue in the current or any of the previous four financial years.
Read more (1)
- Net loss after tax was US$66.8 million (2025: US$35.3 million) with R&D costs of US$25.2 million (2025: US$12.7 million), while Virginia production is directed to prototype production, qualification testing and low-rate initial production.
Summarised from the company’s Annual Report 2026. Figures, results and risks are drawn from the company’s own statements. General information only, not financial advice.
At the close
Key numbers
- Market cap
- $583m
- P/E (trailing)
- -
- Dividend yield
- 0.0%
- Franking
- -
- Grossed-up yield
- 0.0%
- 52-week range
- $1.56 – $8.37
- Avg daily volume (20d)
- 1.6m
- Short interest
- 12.7%
- Beta (vs ASX 200)
- 3.25
- 1-year return
- −68.5%
- RSI (14)
- 35
- vs 200-day average
- −57.5%
ASX Listing Rule 4.10 · FY2026 annual report · as at 31 Aug 2026
Ownership & shareholders
- Total shareholders
- 5,305
- Top 20 ownership
- 79.7%
- Unmarketable parcels
- 566
- On-market buy-back
- None