Skip to content
ASX: STO

Santos

$8.62
▲ +2.07% today
Close 26 Nov 2026
Chart

Price

Close 200-day average
Company profile

About Santos

Santos is a global energy company with operations in Australia, Papua New Guinea, Timor-Leste and the United States. It produces oil and gas, supplies the Australian domestic gas market and supplies liquefied natural gas (LNG) to Asia. It is pursuing emissions reduction through carbon capture and storage, including at Moomba, and has net-zero targets for Scope 1 emissions by 2040 and Scope 2 by 2050.

santos.comOfficial website
Annual report highlights

Annual Report 2025

Santos · FY2025 reported results · Reported in USD

2-year reported financial history

Metric FY2024FY2025 YoY
Net profit (NPAT) US$1.26b US$818m −35.3%
Ordinary dividend 23.3c 23.7c +1.7%

FY2025 cash flow, debt & franking

Operating cash flow
US$2.81b
Capital expenditure
US$2.06b
Free cash flow
US$1.80b
Cash & equivalents
US$1.72b
Net debt
US$4.35b
Income tax paid
US$204m

What went well in FY2025

  1. Barossa LNG start-up Barossa FPSO became operational and first gas was achieved in September 2025, with first cargo early in the new financial year. Barossa and Pikka phase 1 are expected to deliver production growth of 25 to 30 per cent by 2027 compared to 2024.
  2. Pikka phase 1 near completion Pikka phase 1 is more than 98 per cent complete with final commissioning underway. First oil is expected late in the first quarter of 2026 and the project is expected to deliver 80,000 barrels of oil per day at full production.
  3. Lowest unit production costs in a decade Production cost of US$6.78 per boe (excluding Bayu Undan late-life production), down 14 per cent on 2024. Capital expenditure of $2.4 billion was down 16 per cent on 2024.
  4. Solid production and free cash flow Production of 87.7 mmboe was 1 per cent higher than 2024 and sales volumes of 93.5 mmboe were 2 per cent higher. Free cash flow from operations of $1.8 billion (US$1,777 million) was generated despite lower commodity prices and Cooper Basin flooding, with US$4.3 billion in liquidity.
  5. Dividends and Moomba CCS progress Total dividends of US 23.7 cents per share (up 2 per cent on 2024, $770 million in total). Moomba CCS phase 1 stored 1.23 million tonnes CO2e in 2025 and Santos received 907,872 ACCUs, and the 2030 Scope 1 and 2 net equity emissions target was achieved in 2025.

Key risks for FY2026

  1. Oil and gas price volatility All oil, a majority of the LNG and a portion of the gas produced are sold under contracts linked to benchmarks such as Brent crude.
    Read more (3)
    • Any extended or substantial decline in prices may materially affect financial position, funding capacity and credit rating.
    • Brent sensitivity is ~$400 million in free cash flow from operations for every $10 increase in Brent oil prices.
    • Average realised oil price fell 14 per cent to US$73.05/bbl and realised LNG price fell 10 per cent to US$11.12/mmBtu in 2025.
  2. Project development and delivery Major projects may cost more or take longer than expected or fail to perform as planned, resulting in inadequate returns.
    Read more (1)
    • Barossa first gas was achieved in September 2025 but commissioning challenges meant first LNG cargo was not achieved before the end of 2025, and Pikka phase 1 is 98 per cent complete with first oil expected late in the first quarter of 2026.
  3. Reserves replacement and exploration Reserve quantities are inherently uncertain and failure to replace reserves depleted through production is a risk inherent in the industry.
    Read more (2)
    • Failure to develop existing reserves may impact the ability to supply LNG, gas or oil under existing customer contracts.
    • The 2P organic reserve replacement rate was 15 per cent in 2025 (2024: 17 per cent).
  4. Demand, geopolitical and market conditions Demand for oil, gas and LNG may be adversely affected by economic activity, geopolitical developments and military conflicts, OPEC and other producers' supply decisions, alternative energy sources and the transition away from fossil fuels.
    Read more (1)
    • Global energy markets in 2025 remained volatile, driven by persistent geopolitical tensions and a slowdown in economic growth.
  5. Balance sheet and funding pressure Net debt increased to $5,764 million at 31 December 2025 from $4,891 million at 31 December 2024, with gearing at 26.9 per cent.
    Read more (1)
    • Lower commodity prices or an inability to execute the backfill and sustain program without drawing additional debt could increase gearing and cost of capital.

Summarised from the company’s Annual Report 2025. Figures, results and risks are drawn from the company’s own statements. General information only, not financial advice.

At the close

Key numbers

Market cap
$28.0b
P/E (trailing)
24.7×
Dividend yield
3.6%
Franking
0%
Grossed-up yield
3.6%
52-week range
$5.92 – $9.32
Avg daily volume (20d)
11.4m
Short interest
0.9%
Beta (vs ASX 200)
-0.27
1-year return
+33.8%
RSI (14)
47
vs 200-day average
+7.7%
Income

Dividend history

Ex-datePaidTypeAmountFrankedGrossed-up
24 Aug 2026 23 Sep 2026 Interim $0.162 0% $0.162
ASX Listing Rule 4.10 · FY2025 annual report · as at 31 Jan 2026

Ownership & shareholders

Total shareholders
156,899
Top 20 ownership
77.1%
Unmarketable parcels
4,584
On-market buy-back
None

Shareholder spread by parcel size

1-1,000 (69,080 holders) 0.9%
1,001-5,000 (58,205 holders) 4.5%
5,001-10,000 (16,678 holders) 3.7%
10,001-100,000 (12,513 holders) 8.6%
100,001 Over (423 holders) 82.3%