Skip to content
ASX: VUL

Vulcan Energy Resources

$0.950
▲ +0.26% today
Close 26 Nov 2026
In today’s Top 5s #3 · Most shorted
Chart

Price

Close 200-day average
Company profile

About Vulcan Energy Resources

Vulcan Energy Resources is a European lithium company, listed on the ASX and the Frankfurt Stock Exchange, that describes itself as an integrated lithium and geothermal renewable energy business. It pumps hot, lithium-rich brine to the surface, extracts the lithium and uses the geothermal heat in the process. Its first project, Lionheart in Germany's Upper Rhine Valley, is under construction. The company reports more than 450 people across Germany, Australia and France.

v-er.euOfficial website
Annual report highlights

Annual Report 2025

Vulcan Energy Resources · FY2025 reported results · Reported in EUR

2-year reported financial history

Metric FY2024FY2025 YoY
Revenue €8.1m €7.4m −9.5%
Net profit (NPAT) −€42.4m −€69.6m -
Earnings per share −23.0c −30.0c -

FY2025 cash flow, debt & franking

Operating cash flow
−€47.7m
Capital expenditure
€50.2m
Free cash flow
−€98.0m
Cash & equivalents
€518m
Net cash
€518m
Income tax paid
€20k
Franking credit balance
A$0

What went well in FY2025

  1. €2.2 billion Lionheart financing and FID Secured a comprehensive €2.2 billion (A$3.9 billion) financing package in December 2025 including senior debt, government grants, strategic equity and an underwritten equity raising. The Board took a positive Final Investment Decision on 3 December 2025.
  2. Construction commenced Construction of Lionheart commenced in December 2025 with notices to proceed signed with major contractors. Foundation stone laid at the upstream integrated geothermal and lithium extraction plant in Landau. Major supply contracts signed with NORAM Electrolysis Systems, Turboden and ROM Technik, JordProxa, ABB, and a Sedgman and HOCHTIEF joint venture.
  3. Binding Glencore offtake Signed a binding lithium offtake agreement with Glencore, joining Stellantis, Umicore and LG Energy Solution as Phase One offtake partners. Commenced provision of LHM samples to offtake partners to prequalify before full commercial production.
  4. Technology and drilling milestones Produced battery quality lithium hydroxide monohydrate (LHM) at the Central Lithium Electrolysis Optimisation Plant in Frankfurt from lithium chloride extracted at Landau. First new Lionheart well drilled at Schleidberg, with the LSC-1b sidetrack showing production potential of 105 to 125 l/s against a Field Development Plan average of ca. 84 to 94 l/s.
  5. Permits, grants and safety Secured major building permits including the downstream Central Lithium Plant at Industrial Park Höchst and the upstream plant, and the first lithium production permit. Grants of up to ~€104m (~A$186m) approved. Cash and cash equivalents of €517.8 million at 31 December 2025 (31 December 2024: €97.1 million). LTIFR of 1.36 against a target of.

Key risks for FY2026

  1. Financing, funding and FX Limited profitability may increase reliance on equity financing during periods when internal cash flows are insufficient.
    Read more (3)
    • Increased selling by disillusioned shareholders could pressure the share price and constrain future capital-raising.
    • The majority of project expenditure is Euro-denominated, exposing the Company to depreciation of the Australian dollar and other non-Euro currencies.
    • Debt facility had not reached financial close at 31 December 2025, with the majority of conditions precedent satisfied.
  2. Project delivery and drilling Construction-phase risks such as defective work, contractual disputes and safety incidents may result in schedule delays and cost increases.
    Read more (2)
    • Delays to drilling may occur due to shortages of rigs, skilled personnel and critical drilling services.
    • Target of first commercial lithium production in 2028.
  3. Reserves estimate and subsurface performance Resource and Reserves estimates rely on geological assumptions that may prove inaccurate.
    Read more (2)
    • Limited permeability in the rock matrix may restrict movement, injection or disposal of fluids and reduce resource recovery.
    • High connectivity within hydraulic fault damage zones can increase fluid migration risks and lead to costly design adjustments.
  4. Global lithium market and demand Lithium prices are subject to significant volatility driven by global supply–demand dynamics and broader economic and geopolitical conditions.
    Read more (2)
    • Long-term demand may be affected by alternative battery chemistries such as sodium-ion or multivalent-ion technologies.
    • Mitigated by long-term offtake relationships and floor and fixed pricing mechanisms where possible.
  5. Commercial and technology competition Growing competition for Adsorption-type Direct Lithium Extraction (A-DLE) projects and licences may limit ability to secure strategic resources.
    Read more (2)
    • Emerging competitors may develop more environmentally efficient or cost-effective technologies.
    • Underperformance of other A-DLE projects could affect market confidence in Vulcan's technology.

Summarised from the company’s Annual Report 2025. Figures, results and risks are drawn from the company’s own statements. General information only, not financial advice.

At the close

Key numbers

Market cap
$455m
P/E (trailing)
-
Dividend yield
0.0%
Franking
-
Grossed-up yield
0.0%
52-week range
$0.938 – $5.13
Avg daily volume (20d)
5.4m
Short interest
16.2%
Beta (vs ASX 200)
2.44
1-year return
−81.1%
RSI (14)
34
vs 200-day average
−65.4%
ASX Listing Rule 4.10 · FY2025 annual report · as at 20 Mar 2026

Ownership & shareholders

Total shareholders
26,246
Top 20 ownership
83.2%
Unmarketable parcels
7,278
On-market buy-back
None

Shareholder spread by parcel size

1 - 1,000 (17,720 holders) 1.2%
1,001 - 5,000 (5,884 holders) 3.0%
5,001 - 10,000 (1,348 holders) 2.1%
10,001 - 100,000 (1,191 holders) 6.6%
100,001 and over (103 holders) 87.1%

Substantial holders (≥5%)

HOCHTIEF Lithium Holding GmbH 15.41%
Van Eck Associate Corporation and its associates 5.04%