$3.25
▲ +2.85% today
Close 26 Nov 2026
Chart
Price
Close
200-day average
Company profile
About Bannerman Energy
Bannerman Energy is an Australian uranium development company listed on the ASX and NSX, and traded on the OTCQX in the United States. Its flagship asset is the Etango uranium project in the Erongo Region of Namibia, which the company describes as fully permitted. Uranium from Namibia is exported through the Walvis Bay terminal. The company is headquartered in Subiaco, Perth, Western Australia.
Annual report highlights
Annual Report 2026
Bannerman Energy · FY2026 reported results
2-year reported financial history
| Metric | FY2025 | FY2026 | YoY |
|---|---|---|---|
| Revenue | A$4.0m | A$4.2m | +7.1% |
| Net profit (NPAT) | −A$4.1m | −A$8.3m | - |
| Earnings per share | −2.35c | −3.99c | - |
FY2026 cash flow, debt & franking
- Operating cash flow
- −A$7.6m
- Cash & equivalents
- A$53.1m
- Net cash
- A$53.1m
What went well in FY2026
- CNOL strategic partnership and offtake Binding investment subscription and joint venture documentation was executed with CNNC Overseas Limited in February 2026, with CNOL to invest up to US$321.5 million and acquire a 45% interest in Bannerman Energy (UK) Ltd. CNOL will have rights to purchase 60% of life of mine uranium production on market linked terms. The structure provides a pathway for debt-free construction of Etango.
- Funding secured after year end On 9 September 2026 all conditions precedent to the CNOL transaction were satisfied or waived. A fully underwritten A$124 million institutional placement was completed at A$4.00 per share. A non-underwritten Share Purchase Plan targets up to a further A$10 million.
- Early works progress at Etango The bulk earthworks contract was approximately 92% complete at 30 June 2026. Approximately 10,800m³ of concrete had been cast, about 60% of the total volume for the Phase 1 and Phase 2A packages. The HPGR tertiary crusher was delivered to site in December 2025. Dry plant civil and mechanical design was approximately 94% complete.
- Utilities and infrastructure agreements The definitive permanent water supply agreement with NamWater was executed in June 2026. A definitive power supply agreement was signed with NamPower. Phase 1 of the permanent water pipeline was approximately 87% complete. The Etango access road, construction power infrastructure and construction water network were completed and commissioned.
- Safety and balance sheet The project passed one million Lost Time Injury free hours during the year. Cash and cash equivalents rose to $53,125,278 (2025: $46,203,755). The group held cash and liquid assets of approximately A$65 million at year end. Net loss after tax was $8,377,212 (2025: $4,195,357).
Key risks for FY2027
- Etango project funding
Financing arrangements for the Etango Project’s construction are influenced by market conditions, uranium prices, and the terms offered by potential financiers.
Read more (3)
- There is a risk that project construction could be delayed or funded under suboptimal terms.
- CNOL will invest up to US$321.5 million for a 45% interest in Bannerman Energy (UK) Ltd, with completion expected before the end of September 2026.
- A A$124 million institutional placement was completed in September 2026.
- Commodity price
Bannerman’s financial performance is directly linked to uranium (U₃O₈) prices.
Read more (2)
- Volatility could present a risk to the profitability of the Etango Project, particularly during prolonged periods of low prices.
- CNOL will have a life-of-mine entitlement to 60% of Etango yellowcake production, with the remaining 40% marketed independently by Bannerman.
- Etango early works and construction
The construction and commissioning of the Etango Project involve risks relating to potential schedule delays, cost overruns, contractor performance and the coordination of multiple work packages.
Read more (1)
- At year end, Bannerman had residual early works commitments of about A$36 million, with further commitments expected in the short term.
- Sovereign and political risk
Changes in Namibian government policy, taxation, royalties, foreign investment regulation, or mining legislation could affect the Company’s rights, profitability, or ability to repatriate funds.
Read more (1)
- The Etango Mining Licence, ML 250, is structured to be legally enforceable under Namibian law and cannot be retrospectively varied or revoked other than through due legal process.
- Permitting and critical infrastructure
Delays in obtaining, renewing, or complying with environmental, mining, water, and nuclear regulatory approvals could affect project schedules, financing availability, and operating capacity.
Read more (2)
- Project reliance on fuel, electricity, water, port facilities and road transport means disruptions or increased input costs could delay construction or operations.
- Phase 1 of the permanent water pipeline was approximately 87% complete at 30 June 2026.
Summarised from the company’s Annual Report 2026. Figures, results and risks are drawn from the company’s own statements. General information only, not financial advice.
At the close
Key numbers
- Market cap
- $777m
- P/E (trailing)
- -
- Dividend yield
- 0.0%
- Franking
- -
- Grossed-up yield
- 0.0%
- 52-week range
- $2.87 – $4.90
- Avg daily volume (20d)
- 1.1m
- Short interest
- 8.3%
- Beta (vs ASX 200)
- 2.45
- 1-year return
- +9.4%
- RSI (14)
- 47
- vs 200-day average
- −11.9%
ASX Listing Rule 4.10 · FY2026 annual report · as at 22 Sep 2026
Ownership & shareholders
- Total shareholders
- 6,003
- Top 20 ownership
- 82.3%
- Unmarketable parcels
- 400