Company profile
About Paladin Energy
Paladin Energy is an independent uranium company headquartered in Perth and listed on the ASX and TSX. It owns 75 per cent of the Langer Heinrich Mine in Namibia, supplying nuclear utilities. In Canada it is developing the Patterson Lake South Project in Saskatchewan and holds exploration assets in the Athabasca Basin and at the Michelin Project in Labrador. It also holds uranium exploration assets in Queensland and Western Australia.
Annual report highlights
Annual Report 2026
Paladin Energy · FY2026 reported results · Reported in USD
FY2026 reported actuals
| Item | FY2026 actual |
|---|---|
| Revenue | US$304.3m |
| Underlying EBITDA | US$63.2m |
| Underlying attributable profit | US$5.3m |
| Underlying EPS | 1.22c |
| DPS | 0.0c |
FY2026 cash flow, debt & franking
- Operating cash flow
- US$37.7m
- Capital expenditure
- US$65.9m
- Free cash flow
- −US$28.1m
- Cash & equivalents
- US$152m
- Net cash
- US$233m
- Income tax paid
- US$0
What went well in FY2026
- LHM ramp-up completed, guidance met or exceeded Ramp-up to full mining and processing plant operations completed. 4.82Mlb U3O8 produced at the upper end of the revised guidance range after production guidance was increased in April 2026. Cost of Production of US$43.3/lb at the lower end of guidance.
- Revenue up 71% on higher sales and realised price Sales revenue of US$304.3M (FY2025: US$177.7M). 4.35Mlb U3O8 sold at an Average Realised Price of US$70.0/lb, with sales exceeding the upper end of guidance. All customer delivery commitments met.
- Return to gross profit Gross profit of US$52.2M compared with a gross loss of US$26.1M in FY2025. Namibia segment profit before income tax and finance costs of US$45.5M. Net loss after tax narrowed to US$9.1M from US$76.5M. Profit attributable to members of the parent of US$5,336,000.
- Balance sheet strengthened Unrestricted cash and investments of US$265.0M (30 June 2025: US$89.0M). Net Cash of US$233.0M versus US$2.5M. Completed A$300M institutional equity raising and A$100M SPP. Debt Facility restructured with drawn debt reduced to US$32.0M.
- PLS Project advanced and Atlas discovery Ministerial approval of the PLS Project EIS received in February 2026. CNSC determined the Construction Licence application sufficient to undergo regulatory review. New high-grade Atlas discovery 3.5km south of Triple R, with seven of eight drillholes intersecting significant uranium mineralisation.
Key risks for FY2027
- Uranium demand, pricing and sales agreements
The price of, and demand for, uranium is sensitive to macroeconomic and political factors beyond the Group's control, including nuclear energy sentiment, competing energy sources and tariffs or regulation imposed by foreign governments.
Read more (1)
- Paladin mitigates this through Tier-1 customer contracts layered across base-escalated, fixed-price and market-related pricing mechanisms.
- Production, operations and supply chain at LHM
Uranium mining and processing are inherently high-risk, with exposure to plant performance against design specification, supply chain and logistics disruption, input cost increases and foreign currency fluctuations across Australia, Canada and Namibia.
Read more (2)
- FY2027 ore feed is expected to come mainly from J Pit, with lower-grade ore stockpiled.
- Maintenance programs, spares and insurance are the main controls.
- PLS Project permitting and Indigenous consultation
The Métis Nation–Saskatchewan has applied for judicial review of the Saskatchewan Minister of Environment's approval of the PLS Project EIS, alleging inadequate consultation.
Read more (2)
- Paladin denies the claims and intends to defend.
- Failure to maintain relationships with local and Indigenous communities could adversely affect operations and production.
- Capital management, liquidity and debt covenants
Capital requirements are rising for PLS Project development (US$19.2M in FY2026), exploration and Michelin.
Read more (4)
- Failure to obtain financing on favourable terms could delay or postpone plans.
- Debt Facility restructured to US$110M capacity with US$32.0M drawn.
- Unrestricted cash and investments of US$265.0M.
- Covenant compliance is monitored through sensitivity analysis.
- Product loans and delivery obligations
Outstanding uranium product loan borrowings of 400,000lb U3O8 at 30 June 2026 are scheduled for repayment, 200,000lb in the September quarter and 200,000lb in the March quarter of FY2027.
Read more (2)
- The facilities are expected to be renewed, replaced or repaid within the next twelve months.
- Inability to meet delivery obligations could adversely affect the Group.
Summarised from the company’s Annual Report 2026. Figures, results and risks are drawn from the company’s own statements. General information only, not financial advice.
At the close
Key numbers
- Market cap
- $3.2b
- P/E (trailing)
- 119.6×
- Dividend yield
- 0.0%
- Franking
- -
- Grossed-up yield
- 0.0%
- 52-week range
- $5.86 – $14.54
- Avg daily volume (20d)
- 5.2m
- Short interest
- 12.8%
- Beta (vs ASX 200)
- 2.95
- 1-year return
- −20.0%
- RSI (14)
- 39
- vs 200-day average
- −39.2%
ASX Listing Rule 4.10 · FY2026 annual report · as at 31 Jul 2026
Ownership & shareholders
- Total shareholders
- 26,817
- Top 20 ownership
- 84.9%
- Unmarketable parcels
- 2,417
- On-market buy-back
- None