Skip to content
ASX: PDN

Paladin Energy

$6.28
▲ +7.17% today
Close 26 Nov 2026
Chart

Price

Close 200-day average
Company profile

About Paladin Energy

Paladin Energy is an independent uranium company headquartered in Perth and listed on the ASX and TSX. It owns 75 per cent of the Langer Heinrich Mine in Namibia, supplying nuclear utilities. In Canada it is developing the Patterson Lake South Project in Saskatchewan and holds exploration assets in the Athabasca Basin and at the Michelin Project in Labrador. It also holds uranium exploration assets in Queensland and Western Australia.

paladinenergy.comOfficial website
Annual report highlights

Annual Report 2026

Paladin Energy · FY2026 reported results · Reported in USD

FY2026 reported actuals

ItemFY2026 actual
Revenue US$304.3m
Underlying EBITDA US$63.2m
Underlying attributable profit US$5.3m
Underlying EPS 1.22c
DPS 0.0c

FY2026 cash flow, debt & franking

Operating cash flow
US$37.7m
Capital expenditure
US$65.9m
Free cash flow
−US$28.1m
Cash & equivalents
US$152m
Net cash
US$233m
Income tax paid
US$0

What went well in FY2026

  1. LHM ramp-up completed, guidance met or exceeded Ramp-up to full mining and processing plant operations completed. 4.82Mlb U3O8 produced at the upper end of the revised guidance range after production guidance was increased in April 2026. Cost of Production of US$43.3/lb at the lower end of guidance.
  2. Revenue up 71% on higher sales and realised price Sales revenue of US$304.3M (FY2025: US$177.7M). 4.35Mlb U3O8 sold at an Average Realised Price of US$70.0/lb, with sales exceeding the upper end of guidance. All customer delivery commitments met.
  3. Return to gross profit Gross profit of US$52.2M compared with a gross loss of US$26.1M in FY2025. Namibia segment profit before income tax and finance costs of US$45.5M. Net loss after tax narrowed to US$9.1M from US$76.5M. Profit attributable to members of the parent of US$5,336,000.
  4. Balance sheet strengthened Unrestricted cash and investments of US$265.0M (30 June 2025: US$89.0M). Net Cash of US$233.0M versus US$2.5M. Completed A$300M institutional equity raising and A$100M SPP. Debt Facility restructured with drawn debt reduced to US$32.0M.
  5. PLS Project advanced and Atlas discovery Ministerial approval of the PLS Project EIS received in February 2026. CNSC determined the Construction Licence application sufficient to undergo regulatory review. New high-grade Atlas discovery 3.5km south of Triple R, with seven of eight drillholes intersecting significant uranium mineralisation.

Key risks for FY2027

  1. Uranium demand, pricing and sales agreements The price of, and demand for, uranium is sensitive to macroeconomic and political factors beyond the Group's control, including nuclear energy sentiment, competing energy sources and tariffs or regulation imposed by foreign governments.
    Read more (1)
    • Paladin mitigates this through Tier-1 customer contracts layered across base-escalated, fixed-price and market-related pricing mechanisms.
  2. Production, operations and supply chain at LHM Uranium mining and processing are inherently high-risk, with exposure to plant performance against design specification, supply chain and logistics disruption, input cost increases and foreign currency fluctuations across Australia, Canada and Namibia.
    Read more (2)
    • FY2027 ore feed is expected to come mainly from J Pit, with lower-grade ore stockpiled.
    • Maintenance programs, spares and insurance are the main controls.
  3. PLS Project permitting and Indigenous consultation The Métis Nation–Saskatchewan has applied for judicial review of the Saskatchewan Minister of Environment's approval of the PLS Project EIS, alleging inadequate consultation.
    Read more (2)
    • Paladin denies the claims and intends to defend.
    • Failure to maintain relationships with local and Indigenous communities could adversely affect operations and production.
  4. Capital management, liquidity and debt covenants Capital requirements are rising for PLS Project development (US$19.2M in FY2026), exploration and Michelin.
    Read more (4)
    • Failure to obtain financing on favourable terms could delay or postpone plans.
    • Debt Facility restructured to US$110M capacity with US$32.0M drawn.
    • Unrestricted cash and investments of US$265.0M.
    • Covenant compliance is monitored through sensitivity analysis.
  5. Product loans and delivery obligations Outstanding uranium product loan borrowings of 400,000lb U3O8 at 30 June 2026 are scheduled for repayment, 200,000lb in the September quarter and 200,000lb in the March quarter of FY2027.
    Read more (2)
    • The facilities are expected to be renewed, replaced or repaid within the next twelve months.
    • Inability to meet delivery obligations could adversely affect the Group.

Summarised from the company’s Annual Report 2026. Figures, results and risks are drawn from the company’s own statements. General information only, not financial advice.

At the close

Key numbers

Market cap
$3.2b
P/E (trailing)
119.6×
Dividend yield
0.0%
Franking
-
Grossed-up yield
0.0%
52-week range
$5.86 – $14.54
Avg daily volume (20d)
5.2m
Short interest
12.8%
Beta (vs ASX 200)
2.95
1-year return
−20.0%
RSI (14)
39
vs 200-day average
−39.2%
ASX Listing Rule 4.10 · FY2026 annual report · as at 31 Jul 2026

Ownership & shareholders

Total shareholders
26,817
Top 20 ownership
84.9%
Unmarketable parcels
2,417
On-market buy-back
None

Shareholder spread by parcel size

1 - 1,000 (17,424 holders) 1.2%
1,001 - 5,000 (6,594 holders) 3.6%
5,001 - 10,000 (1,563 holders) 2.5%
10,001 - 100,000 (1,165 holders) 5.7%
100,001 and over (71 holders) 87.1%

Substantial holders (≥5%)

State Street Corporate and subsidiaries 10.11%
Van Eck Associates Corporation and its associates 8.94%
Kopernik Global Investors, LLC 5.07%
The Vanguard Group, Inc. and its controlled entities 5.04%